battage

battage

Installed by driving piles before construction can avoid substantial costs for repair. Read More

verriere

verriere

Pieux Metropolitain is the specialist in tight spaces. The driving piles are; the perfect solution to stabilize glass roofing or enlargements. Read More

 QUALITY-EXPERIENCE-PRICE

Piles before construction

E-mail Print PDF

 

WHY INSTALL PILES BEFORE CONSTRUCTION?

Certain grounds, as the clay soils which are compacted under the effect of the dryness, have an insufficient bearing capacity to support the weight of a building. Work of installation of piles driven foundation before construction is less expensive than the stabilization of a building and makes it possible to avoid all the other expenses connected to the degradation of the cracked foundations.

WHEN TO INSTALL PILES DRIVING?

A study of the grounds realized by a recognized laboratory will determine the composition of the ground and its bearing capacity, therefore the need or not for installing piles driven foundation before construction.

THE PIEUX METROPOLITAIN SOLUTION

A compact equipment, specialist in the restricted places!

The equipment of Pieux Metropolitain, compact and using cutting edge of technology, makes it possible to install piles with the new foundations but also in the places most restricted, as on enlargings, glass or solariums.

The piles driving inserted to the rock or the refusal ensure the stability of the new construction.

 

 

 

 

 

free quote best 87x.png
  Click here

 

 

 

Call us today!

514 644.3000